Work Process


Aluminox, shares with you the execution process, meaning how the job is done from step one.

 

  1. Technical visit, inspect the site and highlight the following aspects:
    • Building Functionality.
    • Population census.
    • Adaptation to the architectural environment without affecting it as far as possible.
  2. Developing a Catalog containing main aspects.
  3. Disassembling the existing materials, reshaping walls from any damage as well as the installation of an anti-fire wall.
  4. Anchor´s installation that goes from the slabs to the fixed nodes of the ladder, column´s installation with brackets to hold and give support to very many different parts of the ladder, like the ramps, railings, rest section, etc.
  5. Electrical Installation. This autonomous lamps ignite when the power supply of the building is removed, by means of batteries and cadmium having a 4 hour duration.
  6. Lattice: Coating on the sides of the staircase thus avoiding vertigo to the users.

As we can see in the following images:


Aluminox, Emergency Stairs : Aluminium

All logos and trademarks used on this site are registered trademarks of their respective owners.
©2017 All rights reserved. Aluminox.tech
Webmaster: Vision Web Project
TO ACCEPT We use cookies to personalize content and ads, provide social networking features and analyze traffic on our site. We also share information about your use of our website with our social media, advertising and analytics partners. See details